{"id":7809,"date":"2026-04-24T06:01:01","date_gmt":"2026-04-24T00:31:01","guid":{"rendered":"https:\/\/banitoday.com\/ashram-mukarba-chowk-identified-as-phase-i-for-elevated-ring-road-project-delhi-news\/"},"modified":"2026-04-24T06:01:01","modified_gmt":"2026-04-24T00:31:01","slug":"ashram-mukarba-chowk-identified-as-phase-i-for-elevated-ring-road-project-delhi-news","status":"publish","type":"post","link":"https:\/\/banitoday.com\/hi\/ashram-mukarba-chowk-identified-as-phase-i-for-elevated-ring-road-project-delhi-news\/","title":{"rendered":"Ashram-Mukarba Chowk identified as Phase I for elevated Ring Road project | Delhi News"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-130475806,imgsize-457212,width-400,height-225,resizemode-72\/img_parvesh_verma_1_1_1_83k22hsljpg.jpg\" alt=\"Ashram-Mukarba Chowk identified as Phase I for elevated Ring Road project\" title=\"File photo\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p><span class=\"strong\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">New Delhi:<\/span> Delhi govt has moved a step closer to easing congestion on one of the capital\u2019s busiest corridors, identifying a nearly 22km priority stretch between Ashram and Mukarba Chowk as the \u201cmost viable starting point\u201d for Phase I of the 57.5km elevated Ring Road project.<span class=\"id-r-component br\" data-pos=\"3\"\/>PWD minister Parvesh Verma said the detailed project report noted the section offers a relatively clearer obstruction-free alignment, allowing faster execution with fewer logistical hurdles compared to densely built-up stretches. \u201cIt has fewer encroachments and simpler engineering requirements, so construction can proceed with minimal disruption and faster timelines,\u201d an official said.<span class=\"id-r-component br\" data-pos=\"5\"\/>The corridor, referred to as the \u2018Urban Ring Expressway\u2019 by PWD, will run above Mahatma Gandhi Marg, commonly known as Inner Ring Road, a 55-57 km arterial loop serving as the backbone of Delhi\u2019s transport network. <!-- -->The project is expected to significantly reduce travel time across key routes, said Verma.<span class=\"id-r-component br\" data-pos=\"10\"\/>The project has been divided into phases, covering critical junctions like Majnu Ka Tila, Salimgarh Fort, Moti Bagh, Rajouri Garden and Azadpur. The Mukarba Chowk-Ashram stretch has been further divided into three segments: from Mukarba Chowk near Azadpur to Metcalf House, Majnu Ka Tila to Salimgarh Fort, and from Salimgarh Fort to DND flyover.<span class=\"id-r-component br\" data-pos=\"13\"\/>There are several challenges, among them the integration of the elevated road with existing infrastructure, including a grade separator and the Red Line near Kashmere Gate. Officials said careful planning will be required to ensure seamless connectivity without disrupting existing systems.<span class=\"id-r-component br\" data-pos=\"15\"\/>Another sensitive aspect involves heritage conservation. The alignment passes close to three protected monuments, including Salimgarh Fort, which falls under ASI jurisdiction. <!-- -->Authorities have assured construction activities will strictly adhere to ASI guidelines to safeguard the historical structures.<span class=\"id-r-component br\" data-pos=\"19\"\/>The corridor also cuts through some of Delhi\u2019s most densely populated neighbourhoods, including South Extension, Punjabi Bagh, Lajpat Nagar and Ashram, raising concerns about traffic diversions during execution.<span class=\"id-r-component br\" data-pos=\"21\"\/>Financial viability remains another major hurdle. The project\u2019s estimated cost ranges between Rs 5,500 crore and Rs 8,000, said a senior official.<span class=\"id-r-component br\" data-pos=\"24\"\/>Inner Ring Road begins at Shalimar Bagh in north Delhi and extends to Azadpur. Once a relatively efficient arterial corridor designed to facilitate cross-city travel, Ring Road now faces chronic congestion and is buckling under mounting pressure, unlike Outer Ring Road, developed later to redirect peripheral traffic. From urban sprawl and flawed planning to infrastructure saturation and enforcement gaps, several factors have forced the once-speedy corridor into a glacial pace.<span class=\"id-r-component br\" data-pos=\"27\"\/>Originally planned in the 1950s and completed in the following decades, Ring Road has witnessed a very different city \u2014 both in terms of population and traffic volume. Back then, Delhi had less than three million residents. Today, it is home to over 30 million. The road, however, has not expanded proportionately to accommodate this growth. What was once designed as a bypass now functions as a semi-central road.<span class=\"id-r-component br\" data-pos=\"29\"\/>As the city grew outward, neighbourhoods like South Extension, Punjabi Bagh, Lajpat Nagar and Ashram became dense urban hubs. Ring Road now cuts through commercial, institutional and residential areas, and is used to access shops, markets, schools and hospitals, all of which lead to frequent stops and lane intrusions. Intersections like AIIMS, Moolchand, Dhaula Kuan, Ashram and ITO have turned into major choke points where arterial routes intersect.<!-- --> While flyovers and underpasses have been built at some locations, they often only shift the congestion rather than resolve it.<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/delhi\/ashram-mukarba-chowk-identified-as-phase-i-for-elevated-ring-road-project\/articleshow\/130475807.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: Delhi govt has moved a step closer to easing congestion on one of the capital\u2019s busiest corridors, identifying a nearly 22km priority stretch between Ashram and Mukarba Chowk as the \u201cmost viable starting point\u201d for Phase I of the 57.5km elevated Ring Road project.PWD minister Parvesh Verma said the detailed project report noted [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":7810,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[150],"tags":[],"class_list":{"0":"post-7809","1":"post","2":"type-post","3":"status-publish","4":"format-standard","5":"has-post-thumbnail","7":"category-delhi"},"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/7809","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/comments?post=7809"}],"version-history":[{"count":0,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/7809\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media\/7810"}],"wp:attachment":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media?parent=7809"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/categories?post=7809"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/tags?post=7809"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}