{"id":5739,"date":"2026-04-19T21:08:58","date_gmt":"2026-04-19T15:38:58","guid":{"rendered":"https:\/\/banitoday.com\/indias-clean-energy-push-govt-mulls-bids-for-220-mwe-small-modular-reactor\/"},"modified":"2026-04-19T21:08:58","modified_gmt":"2026-04-19T15:38:58","slug":"indias-clean-energy-push-govt-mulls-bids-for-220-mwe-small-modular-reactor","status":"publish","type":"post","link":"https:\/\/banitoday.com\/hi\/indias-clean-energy-push-govt-mulls-bids-for-220-mwe-small-modular-reactor\/","title":{"rendered":"India\u2019s clean energy push: Govt mulls bids for 220 MWe Small Modular Reactor"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-130372825,imgsize-12250,width-400,height-225,resizemode-4\/representational-image.jpg\" alt=\"India\u2019s clean energy push: Govt mulls bids for 220 MWe Small Modular Reactor\" title=\"Representational image\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>India is set to take a major step in expanding its nuclear energy programme, with plans to invite bids for the establishment of a 220 MWe Bharat Small Modular Reactor (BSMR-200), within the next three to six months.<!-- --> The project is considered as a major part of the country\u2019s clean energy transition, officials told ET.<span class=\"id-r-component br\" data-pos=\"3\"\/>Foreign companies will be allowed to participate in the bidding process, but only through tie-ups with local partners, an official said. The reactor design will be standardised, and the first unit is expected to serve as a model for future installations.<span class=\"id-r-component br\" data-pos=\"5\"\/>\u201cA cost of roughly Rs 30 crore per megawatt (MW) has been approved for BSMR-200 as a pilot project,\u201d another official told the financial daily.<span class=\"id-r-component br\" data-pos=\"9\"\/>The BSMR-200 is being jointly developed by the Bhabha Atomic Research Centre (BARC) and the Nuclear Power Corporation of India Ltd (NPCIL). The total cost of development and construction is estimated at around Rs 5,960 crore, to be funded through the Nuclear Energy Mission. After approvals, the construction is expected to take anywhere between 60 and 72 months.<span class=\"id-r-component br\" data-pos=\"11\"\/>Officials said that inter-ministerial consultations are currently underway to finalise the bidding details.<span class=\"id-r-component br\" data-pos=\"14\"\/>The move follows the opening up of the nuclear sector to private investment after the enactment of the Sustainable Harnessing and Advancement of Nuclear Energy for Transforming India (SHANTI) Act in December 2025.<span class=\"id-r-component br\" data-pos=\"16\"\/>\u201cA final call on the proposal will be taken by the Cabinet Committee on Economic Affairs,\u201d the official said, adding that domestic firms capable of executing the project on an engineering, procurement and construction (EPC) basis have already been identified.<span class=\"id-r-component br\" data-pos=\"19\"\/>The Union Budget had already alloted Rs 20,000 crore to develop at least five indigenously designed and operational small modular reactors by 2033 under the Nuclear Energy Mission.<span class=\"id-r-component br\" data-pos=\"21\"\/>India has also set an ambitious goal of reaching 100 GW of nuclear power capacity by 2047, alongside efforts to strengthen local manufacturing and technology development in the sector.<span class=\"id-r-component br\" data-pos=\"23\"\/>In a recent milestone for the nuclear programme, India\u2019s prototype fast breeder reactor reached criticality this month.<span class=\"id-r-component br\" data-pos=\"25\"\/><\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/business\/india-business\/indias-clean-energy-push-govt-mulls-bids-for-220-mwe-small-modular-reactor\/articleshow\/130372734.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>India is set to take a major step in expanding its nuclear energy programme, with plans to invite bids for the establishment of a 220 MWe Bharat Small Modular Reactor (BSMR-200), within the next three to six months. The project is considered as a major part of the country\u2019s clean energy transition, officials told ET.Foreign [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":5740,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[],"tags":[],"class_list":["post-5739","post","type-post","status-publish","format-standard","has-post-thumbnail"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/5739","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/comments?post=5739"}],"version-history":[{"count":0,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/5739\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media\/5740"}],"wp:attachment":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media?parent=5739"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/categories?post=5739"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/tags?post=5739"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}