{"id":30893,"date":"2026-07-05T00:40:56","date_gmt":"2026-07-04T19:10:56","guid":{"rendered":"https:\/\/banitoday.com\/no-bidders-again-for-mc-causeway-repair-work-tender-to-be-floated-after-monsoon-chandigarh-news\/"},"modified":"2026-07-05T00:40:56","modified_gmt":"2026-07-04T19:10:56","slug":"no-bidders-again-for-mc-causeway-repair-work-tender-to-be-floated-after-monsoon-chandigarh-news","status":"publish","type":"post","link":"https:\/\/banitoday.com\/hi\/no-bidders-again-for-mc-causeway-repair-work-tender-to-be-floated-after-monsoon-chandigarh-news\/","title":{"rendered":"No bidders again for MC causeway repair work; tender to be floated after monsoon | Chandigarh News"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div data-articlebody=\"1\"><video-embed value=\"false\"\/><\/p>\n<div class=\"ihgno clearfix  \">\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-47529300,imgsize-110164,width-400,height-225,resizemode-75\/47529300.jpg\" alt=\"No bidders again for MC causeway repair work; tender to be floated after monsoon\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>C<span class=\"strong\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">handigarh: <\/span>The municipal corporation\u2019s engineering department has failed to attract a single bidder for the second consecutive time for the repair and strengthening of the causeway connecting Industrial Area Phase I with Chandigarh Railway Station.<!-- --> Officials said the tender will now be floated again after the <a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/monsoon-season\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\">monsoon season<\/a>.<span class=\"id-r-component br\" data-pos=\"7\"\/>Sources said major repair work cannot be undertaken during the rains. However, the MC has carried out minor repairs, recarpeting and safety measures to ensure uninterrupted traffic movement on the busy stretch.<span class=\"id-r-component br\" data-pos=\"10\"\/>The causeway, built across the Sukhna Choe in 1998, suffered significant damage during last year\u2019s monsoon due to heavy water flow. Portions of its wing walls and side structures were damaged, while iron railings were washed away.<span class=\"id-r-component br\" data-pos=\"14\"\/>Officials said a tender worth around Rs 40 lakh was prepared incorporating all safety and structural requirements, but no contractor came forward. The structure is designed to allow normal water flow through pipes beneath it, while excess monsoon discharge passes over the causeway.<span class=\"id-r-component br\" data-pos=\"16\"\/>The route serves as a key entry point for commuters travelling from Panchkula, Manimajra, Daria and the Chandigarh railway station area, making it one of the city\u2019s busiest traffic corridors.<\/div>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/chandigarh\/no-bidders-again-for-mc-causeway-repair-work-tender-to-be-floated-after-monsoon\/articleshow\/132186980.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>Chandigarh: The municipal corporation\u2019s engineering department has failed to attract a single bidder for the second consecutive time for the repair and strengthening of the causeway connecting Industrial Area Phase I with Chandigarh Railway Station. Officials said the tender will now be floated again after the monsoon season.Sources said major repair work cannot be undertaken [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":26561,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[299],"tags":[],"class_list":["post-30893","post","type-post","status-publish","format-standard","has-post-thumbnail","category-latest-news"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/30893","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/comments?post=30893"}],"version-history":[{"count":0,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/30893\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media\/26561"}],"wp:attachment":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media?parent=30893"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/categories?post=30893"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/tags?post=30893"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}