{"id":24844,"date":"2026-06-22T04:27:55","date_gmt":"2026-06-21T22:57:55","guid":{"rendered":"https:\/\/banitoday.com\/grid-bottlenecks-hamper-green-energy-expansion-india-news\/"},"modified":"2026-06-22T04:27:55","modified_gmt":"2026-06-21T22:57:55","slug":"grid-bottlenecks-hamper-green-energy-expansion-india-news","status":"publish","type":"post","link":"https:\/\/banitoday.com\/hi\/grid-bottlenecks-hamper-green-energy-expansion-india-news\/","title":{"rendered":"Grid bottlenecks hamper green energy expansion | India News"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div data-articlebody=\"1\"><video-embed value=\"false\"\/><\/p>\n<div class=\"ihgno clearfix  \">\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-131897441,imgsize-369989,width-400,height-225,resizemode-4\/131897441.jpg\" alt=\"Grid bottlenecks hamper green energy expansion\" title=\"Representative image\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p>NEW DELHI: India&#8217;s rapid renewable energy expansion is running into a serious bottleneck, with delays in transmission infrastructure forcing large-scale curtailment of green power.<span class=\"id-r-component br\" data-pos=\"2\"\/>According to Ember, an energy think-tank, transmission constraints accounted for nearly two-thirds of the 470 gigawatt-hours of renewable energy curtailed in first quarter of 2026. The problem has become particularly acute in Rajasthan and Gujarat, which host the bulk of India&#8217;s utility-scale solar and wind projects. Of the country&#8217;s total installed power generation capacity of 543 GW, solar energy accounts for 154 GW and wind, 56 GW.<span class=\"id-r-component br\" data-pos=\"7\"\/>The mismatch between pace of renewable energy deployment and transmission readiness is emerging as one of the biggest operational risks for sector.<span class=\"id-r-component br\" data-pos=\"9\"\/>&#8220;India&#8217;s renewable energy curtailment arising from transmission constraints is beginning to reach materially significant levels,&#8221; said Duttatreya Das, energy analyst at Ember. He said the system would eventually have to move away from &#8220;generation-led transmission planning&#8221; towards a model where generation and transmission are planned together.<span class=\"id-r-component br\" data-pos=\"12\"\/>An official from the ministry of new and renewable energy, acknowledging that curtailment was becoming a concern, said govt was working on solutions. Large-scale deployment of battery energy storage systems and grid-forming inverters would be crucial for integrating renewable energy into the grid. &#8220;We are in regular touch with power ministry and Central Electricity Regulatory Commission for enhancement of transmission capacity,&#8221; the official said.<span class=\"id-r-component br\" data-pos=\"15\"\/>As per Ember, India has achieved only about 80% of its annual transmission targets over past five years, leading to a growing backlog. For FY27 alone, the requirement for additional inter-state transmission capacity has been estimated at over 61,000 circuit kilometres.<span class=\"id-r-component br\" data-pos=\"17\"\/>The delays are driven by right-of-way disputes, land acquisition hurdles, forest clearances and supply constraints for critical high-voltage transmission equipment, the report noted. <span class=\"id-r-component br\" data-pos=\"19\"\/><\/div>\n<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/india\/grid-bottlenecks-hamper-green-energy-expansion\/articleshow\/131897439.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>NEW DELHI: India&#8217;s rapid renewable energy expansion is running into a serious bottleneck, with delays in transmission infrastructure forcing large-scale curtailment of green power.According to Ember, an energy think-tank, transmission constraints accounted for nearly two-thirds of the 470 gigawatt-hours of renewable energy curtailed in first quarter of 2026. The problem has become particularly acute in [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":24845,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[133],"tags":[],"class_list":["post-24844","post","type-post","status-publish","format-standard","has-post-thumbnail","category-country"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/24844","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/comments?post=24844"}],"version-history":[{"count":0,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/24844\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media\/24845"}],"wp:attachment":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media?parent=24844"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/categories?post=24844"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/tags?post=24844"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}