{"id":17810,"date":"2026-06-07T04:12:26","date_gmt":"2026-06-06T22:42:26","guid":{"rendered":"https:\/\/banitoday.com\/clock-tower-near-talkatora-stadium-set-for-completion-by-month-end-delhi-news\/"},"modified":"2026-06-07T04:12:26","modified_gmt":"2026-06-06T22:42:26","slug":"clock-tower-near-talkatora-stadium-set-for-completion-by-month-end-delhi-news","status":"publish","type":"post","link":"https:\/\/banitoday.com\/hi\/clock-tower-near-talkatora-stadium-set-for-completion-by-month-end-delhi-news\/","title":{"rendered":"Clock tower near Talkatora Stadium set for completion by month-end | Delhi News"},"content":{"rendered":"<p> <br \/>\n<\/p>\n<div>\n<div class=\"e9jwa\">\n<div class=\"vdo_embedd\">\n<div class=\"GfdvZ\">\n<section class=\"_bIDB  clearfix id-r-component leadmedia undefined undefined  E9tg9 \" style=\"top:0px\">\n<div class=\"_bIDB\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">\n<div class=\"ypVvZ\">\n<div class=\"WGttI\"><img src=\"https:\/\/static.toiimg.com\/thumb\/msid-131558318,imgsize-147436,width-400,height-225,resizemode-72\/img-20260606-wa0083jpg.jpg\" alt=\"Clock tower near Talkatora Stadium set for completion by month-end\" title=\"Clock tower inspection\" decoding=\"async\" fetchpriority=\"high\"\/><\/div>\n<\/div>\n<\/div>\n<\/section>\n<\/div><\/div>\n<\/div>\n<p><span class=\"strong\" data-ua-type=\"1\" onclick=\"stpPgtnAndPrvntDefault(event)\">New Delhi: <\/span>The upcoming <a href=\"https:\/\/timesofindia.indiatimes.com\/topic\/clock-tower\" styleobj=\"[object Object]\" class=\"\" commonstate=\"[object Object]\" frmappuse=\"1\">clock tower<\/a> at Shankar Road\u2013Mandir Marg junction near Talkatora Stadium is set to be transformed into a landmark gateway to the New Delhi Municipal Council (NDMC) area, with civic authorities planning a host of smart and aesthetic features around the structure.<span class=\"id-r-component br\" data-pos=\"6\"\/>NDMC vice-chairman Kuljeet Chahal said nearly 80% of the civil work has been completed and the agency is targeting completion by June 30. Once construction is done, the focus will shift to developing the site into an iconic attraction on the lines of New York\u2019s Times Square and similar global modern structures.<span class=\"id-r-component br\" data-pos=\"8\"\/>\u201cWe plan to install a large LED display wall around the clock tower. The screens would provide real-time information, such as air pollution levels, temperature forecasts, nearby attractions and public messages. <!-- -->The system will be supported by AI-enabled equipment to enhance information dissemination and visitor engagement,\u201d Chahal said after a recent inspection.<span class=\"id-r-component br\" data-pos=\"13\"\/>\u201cWe don\u2019t want it to look like any other conventional clock tower. It should represent \u2018Viksit NDMC\u2019. A detailed discussion has been held with officials, who will come up with an updated plan soon,\u201d he added.<span class=\"id-r-component br\" data-pos=\"15\"\/>NDMC\u2019s beautification plan includes projector lighting to illuminate the clock faces on all sides, 5-6-metre-high decorative poles fitted with 70-watt post-top lights, and bulkhead lighting inside the tower to illuminate stairways. Wall-mounted fans will also be installed at the premises.<span class=\"id-r-component br\" data-pos=\"19\"\/>Officials said all electrical installations inside and outside the structure, along with associated accessories, will be properly earthed to ensure safety and operational efficiency. In addition, horticulture work has also been planned around the tower.<span class=\"id-r-component br\" data-pos=\"21\"\/>From an engineering perspective, the clock tower is being designed to withstand both wind and seismic forces. <!-- -->\u201cInternal electrical installations, along with colourful linear fa\u00e7ade lighting, will be among the other features,\u201d an official said.<span class=\"id-r-component br\" data-pos=\"25\"\/>The structure comprises a reinforced concrete framework supported by RCC raft foundations. Its exterior will feature wire-cut brick cladding in line with the approved architectural design, giving it a distinctive and durable finish.<span class=\"id-r-component br\" data-pos=\"27\"\/>The foundation stone for the project was laid in Aug 2025 by former LG V K Saxena, with the initial deadline set as Jan 31, 2026. <!-- -->NDMC missed the target, with officials attributing the delay to GRAP restrictions and challenges encountered during site preparation. Subsequently, the revised April 30 deadline was also missed. Officials later clarified that excavation work took longer than expected due to rocky strata at the site.<span class=\"id-r-component br\" data-pos=\"31\"\/>The nearly 27-metre-high octagonal tower, being built at a cost of Rs 1.8 crore, is designed to blend Hindu, Mughal and Colonial-era architectural styles. <!-- -->Stone engraving will be carried out on the fa\u00e7ade, followed by polishing and installation of lighting to highlight the detailing during the final phase of construction. Each of the tower\u2019s eight sides will measure 1.2 metres.<span class=\"id-r-component br\" data-pos=\"35\"\/>The clock to be installed atop the tower will feature a modern, weather-resistant design with both backlit and front-lit illumination. It will be mounted using vibration-resistant technology to ensure durability and accuracy. NDMC officials said regular maintenance will be undertaken for the smooth functioning of the structure.<\/div>\n<p><br \/>\n<br \/><a href=\"https:\/\/timesofindia.indiatimes.com\/city\/delhi\/clock-tower-near-talkatora-stadium-set-for-completion-by-month-end\/articleshow\/131558320.cms\">Source link <\/a><\/p>\n","protected":false},"excerpt":{"rendered":"<p>New Delhi: The upcoming clock tower at Shankar Road\u2013Mandir Marg junction near Talkatora Stadium is set to be transformed into a landmark gateway to the New Delhi Municipal Council (NDMC) area, with civic authorities planning a host of smart and aesthetic features around the structure.NDMC vice-chairman Kuljeet Chahal said nearly 80% of the civil work [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":17811,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[150],"tags":[],"class_list":["post-17810","post","type-post","status-publish","format-standard","has-post-thumbnail","category-delhi"],"amp_enabled":true,"_links":{"self":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/17810","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/comments?post=17810"}],"version-history":[{"count":0,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/posts\/17810\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media\/17811"}],"wp:attachment":[{"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/media?parent=17810"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/categories?post=17810"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/banitoday.com\/hi\/wp-json\/wp\/v2\/tags?post=17810"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}